Construction of the San Fernando Station with the purpose to provide 300,000 barrels of crude oil per day. Subject to the customer`s budget and agreed deadlines.  The interaction with local community ensured no protests or road blockages affected OBS`s productivity during operations.

Activities performed:

  • Basic and detailed engineering
  • Pipe fitting
  • Construction of civil Works and buildings
  • Cabling and wiring of equipment
  • Manufacturing and installation of metal structures
  • Equipment installation
  • Construction of electrical substations and control romo
  • Pre-commissioning and commissioning
  • Supply of materials
  • Date: February 10, 2015
  • Client: Ecopetrol S.A.
  • Category: